final stretch on shell construction
Friday, November 20th, 2009

Since I have left to Berlin at the end of the summer, I have been back to Jenin twice, once in October and once now, at end of November, to supervise the construction works. Read the rest of this entry »
The visit in October was most effective. Within a week, the stage was enlarged by a steel/wood construction. It was amazing how fast the ironworks and the wooden decking was ready. Here in Jenin, I found the most incredible metal-works company owned by the Jalbuni family, who supported the project from the very beginning by generous donations. With their help, we are also restoring the old cast-iron cinema chairs. Their excellent equipment makes it possible to do almost anything.