These are the up-to-date pictures. The basic work is done and the installation of electricity and air conditioning have begun. Theatrical stage and restroom facilities are being finished up these days. A difficult job was to remove the sticky old paint from the walls. For a long time all attempts to get them off failed, but Amin and Ma'moun were working frantically on the issue. Great thanks to both of you! Now the first layer of fresh paint is covering the entrance area. The next big steps will be the installation of the computer network and the sound-system.
See the first pictures of the cinema 
|